LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association,
LANDSCAPE IRRIGATION SYSTEM
PART one - GENERAL
1.1          DESCRIPTION of labor
  A.          The add this Section includes the landscape irrigation system.
  B.          connected Work:
                Section 02200    Earthwork
                Section 02480    Landscape Planting
                Section 02481    Warranty and Maintenance of Irrigation Systems and Plant Materials
                Section 02622    Plastic Pipe ( PVC )
                Section 02713    Water Distribution Systems
                Section 03300    Cast-In-Place Concrete
                Section 16010    General Provision for craft
1.2          QUALITY ASSURANCE
  A.          printed specifications, standards, tests or counseled strategies of trade, trade or governmental organizations apply to figure of this section wherever cited by abbreviations noted below.
                1.            yank National Standards Institute (ANSI).
                2.            yank Society for Testing and Materials (ASTM).
                3.            Owner Electrical Code (RCEC).
                4.            National Electrical makers Association (NEMA).
                5.            Underwriters Laboratory (UL).
                6.            Owner branch of knowledge Code (RCAC).
 
 B.           Reference Standards:
                Sponsor Number             Subject
ASTM D1784       Rigid PVC (PVC) Com- pounds and Chlorinated PVC (CPVC) Compounds.
ASTM D1785       Polyvinyl Chloride (PVC) Plastic Pipe, Schedules forty, 80 and 120.
ASTM D2287       Non-rigid Vinyl Chloride chemical compound and polymer Molding and Extrusion Com- pounds.
ASTM D2464       Threaded PVC (PVC) Plastic Pipe Fittings, Schedule eighty.
ASTM D2466       Socket-Type PVC (PVC) Plastic Pipe Fittings, Schedule forty.
ASTM D2467       Socket-Type PVC (PVC) Plastic Pipe Fittings, Schedule eighty.
AWWA C701       Standard for Cold Water Meters - rotary engine kind for client Service.
                NEMA FB 1                          Fittings and Supports for passage and Cable Assemblies.
                Nepa 70-310-11 Conductors for General Wiring - Markings.
SAS fourteen and 15       Pipe and strategies of take a look at for Potable Water of Un-plasticized Pipe (UPVC).
                UL-6                                       Rigid Non-Metallic passage.
  C.          Testing and Inspecting:
1.            Tests and Inspections:  The Contractor shall schedule and perform all tests and inspections needed. prices of all tests and inspections and prices of retests of rejected work shall be borne by the Contractor.
2.            Filling, backfilling, and compaction shall be per- fashioned to satisfy the approval of the Owner as per Section 02200 "Earthwork."
3.            go with "Cast-In-Place Concrete" Section 03300 for pits and thrust blocks.
  D.          Layout of the Work:  The Contractor shall be to blame for the accuracy of all layout work and shall retain and buy the services of a commissioned surveyor to line the lines and grades for all construction.
1.3          SUBMITTALS
  A.          Manuals: before the ultimate review of the irrigation system, the Contractor shall furnish manuals, to the Owner.  The manuals shall contain complete exploded read drawings, diagrams and spare elements lists of all instrumentality put in showing elements and catalog numbers. additionally, every service manual shall contain the following:
1.            Index sheet indicating the Contractor's name, address, and signaling.
2.            Copies of apparatus warranties and certificates.
3.            List of apparatus with names, addresses, and phonephone numbers of native manufacturer's representatives.
4.            Complete operational and maintenance directions in decent detail to allow operational personnel to know, operate and maintain all instrumentality put in.
5.            Paint and protecting coatings shall be pictured by sample labels (containing name or title of materials, manufacturer's stock range, manufacturer's name and contents by volume, for major pigment and vehicle constituents similarly as dilution and application instructions).
  B.          look Drawings: look drawings for the subsequent irrigation system elements square measure required:
1.            Preparation of layouts of secondary and tertiary lines showing FCM, RCV positions and tag numbers, and totally coordinated dimensioned piping layouts beside layouts one-line diagrams or schedule of all electrical management cables. the ability cables to FCM's shall be shown on the power/lighting electrical drawings.  All wind and tertiary distribution softline shall be shown as way because the last sprinkler/emitter on every branch. For emitters, the particular positions of each the soft lines and electrode points shall be shown in reference to the particular positions of individual trees, shrubs and groundcover plants.  The nominal sizes and internal diameter of all wind shall be indicated.  Flush points, road crossings and sleeve locations shall be indicated.
2.            Irrigation controller with internal schematic, schematic, bill of fabric for field management module, pedestal, sign layout and concrete pad.
3.            Boxes to incorporate all internal elements and assemblies of elements.  Indicate all box dimensions comprehensive of lid configuration, closing and protection hardware, and lid title.
  C.          Materials List:
1.            In period of time set forth by the Owner, the Contractor shall submit copies of an entire list of materials planned for installation to the Owner for approval.
2.            The list shall embrace the item range, size and outline of the fabric, the manufacturer and model range, and marque as applicable.
3.            Paint and protecting coatings shall be pictured by sample labels containing name or title of fabric, manufacturer's stock range, manufacturer's name and contents by volume, for major pigment and vehicle constituents similarly as dilution and application directions.
  D.          Samples (See Section 01340):
                All of the subsequent needed samples for irrigation system elements shall be submitted along in one package submittal.  Separate submittals don't seem to be acceptable.
1.            Plastic pipe and passage, electrode distribution hose and electrode outlet conduit, 600 millimeter (2 ft) length of every size and kind.
2.            one among every valve box lid with inscriptions in Arabic and English (see Paragraph a pair of.5B).
3.            management wire, 600 millimeter (2 ft) length of every color, with schedule of color description.
4.            protection packet for waterproof management wire splices.
5.            Plastic fittings, one among every material kind (one size only).  Drip lateral fittings, one among every kind for every pipe size.
                6.            management valves of every kind complete with coil valve assembly.
                7.            Controller chart, one typical.
                8.            Drip emitters, one among every kind planned to be used.
                9.            flow preventer 
                10.          Signs, one typical.
11.          Submit samples of paint and protecting coatings for review of color and texture solely. give a list for the fabric and application for every coat of every end sample.  On three hundred millimeter x three hundred millimeter (12 in. x 12 in.) chipboard, give 3 samples of every color and material, with texture to simulate actual conditions. render every sample as requested till the desired effulgence, color and texture is achieved.