Ad Code

Responsive Advertisement

Ticker

12/recent/ticker-posts

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

 SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC
SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC


SOIL TREATMENT FOR white ant management

 

 

PART one - GENERAL

 

1.1          DESCRIPTION of labor

 

  A.          The work of this section includes pre-construction soil treatment for preventive management of subterranean termites in buildings.

 

  B.          The scope of labor includes however isn't restricted to the procurance of all materials when acceptable approval by the Owner, temporary storage consistent with the manufacturer's recommendations, excavation and alternative necessary website preparation, application of answer, sampling and testing, safety, disposal of venturous waste, and close up of space propaedeutic to any construction.

 

1.2          SUBMITTALS

 

  A.          Submit makers technical knowledge sheets for materials and specific application directions for review and approval before commencement of the work.

 

1.3          QUALITY ASSURANCE

 

  A.          applier Qualifications

 

soil-treatment-for-termite-control-inspection-and-test-plan-soil-termiticide-treatment-white-ant-termite-infestation-bifenthrin-based-supplier-emulsible-dilutes-low-human-toxicity-low-odour-no-skin-irritation-low-vapor-pressure-wont-hang-around-your-building-emulsible-harmful-pesticide-sprayer-antecedently-synthetic

1.            The work of this section shall be performed by a contractor certified by the Ministry of Agriculture in tormentor management with a minimum of 5 years expertise in similar work.  Qualifications of the applier shall be submitted for review and approval by the Owner.

 

  B.          review and check set up

 

1.            Submit for review and approval a Soil Treatment review AND check set up (ITP) reflective the wants of those specifications and approved submittals before commencement of construction.

 

2.            The ITP shall address sequence, methodology and management of application and criteria for acceptance of labor.

 

3.            The ITP shall embody procedures for sampling and testing of the soil by chemical extraction to see the content of the termiticide answer residual within the soil before and when treatment. The results of those tests shall represent the management sample.  Sampling Associate in Nursingd testing shall be done by an freelance Testing Laboratory approved by the Owner.

 

4.            The Contractor shall submit a layout of the world to be treated counteracted into individual check AREAS. check AREAS shall be restricted to the world for every kind of check listed below, and area unitas that aren't contiguous to and are separated from alternative spaces aren't to be combined for check area calculations. every check space shall have sample and check locations chosen by the Owner Representative and indicated on the layout when treatment and before testing.

 

5.            Sampling Associate in Nursingd testing of every check space shall be performed by an freelance check Laboratory as follows:

 

a.            one check per every 250 square metre space beneath the block on grade.

               

b.            one check per every fifty square metre space of vital areas beneath the block on grade.

               

c.             one check per seventy five linear meters per thirty cm elevate at perimeter of concrete and/or solid masonry unit footings and foundations.

 

6.            If any initial check fails, 3 further retests shall be taken within the same check space, at locations directed by the Owner.  If any of the 3 retests fail, the complete check space, shall be people and retested in compliance with this specification and also the approved ITP.  If all 3 tests pass solely the situation of original failure shall be people and retested.

 

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

7.            The Contractor are allowed the choice to entirely or partly retreat the check space between initial tests and retests beneath the observation of the Owner.  Such retreatment won't preclude any retreatment needed by this specification within the event of unsuccessful results when retesting.

 

8.            The ITP shall need a written technical proposal for preparation and check ways of management samples from the categories of fabric to be treated.  The management samples shall be ready and tested by the freelance Laboratory beneath the observation of the Owner.  The check results obtained from the treated management samples shall be the idea for acceptance or rejection of the work. the factors for acceptance is as follows:

 

a.            Any initial check result that is a smaller amount than ninetieth of the results of the individual management sample shall be thought of to fail.

               

b.            Any retest result that is a smaller amount than ninety fifth of the results of the individual management sample shall be thought of to fail.

 

1.4          SAFETY

 

  A.          The Contractor shall post warning signs in Arabic and English in areas of application to tell staff and also the public that venturous soil treatment (poison) has been applied. take away signs only treated area unitas are adequately lined by concrete.

 

  B.          The Contractor shall treat all empty containers and alternative contaminated materials as venturous waste and properly dispose in selected areas.  Keep all such waste in one space, marked as venturous (poisonous) material till it are often properly disposed. don't enable such material to become mixed into alternative trash or waste materials.

 

  C.          staff shall wear protecting article of clothing and alternative equipment counseled by the manufacturer.

 

  D.          additionally to necessities listed, the Contractor shall go with all safety recommendations created by the manufacturer or needed by the Owner.

 

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

1.5          WARRANTY

 

  A.          The Contractor shall furnish a written pledge certifying that the applied soil termiticide treatment can stop infestation of subterranean termites for a amount of 10 (10) years from the date of initial acceptance, signed by the Contractor and also the applier.

 

  B.          The pledge shall need the Contractor to produce further treatment if there's any proof of white ant infestation throughout the pledge amount. further treatment are applied in compliance with Owner specifications for post-construction white ant treatment.

 

  C.          The pledge shall additionally need the Contractor to repair to the satisfaction of the Owner or furnish equal or higher replacements for injury caused by white ant infestation throughout the pledge amount.

 

PART two  - merchandise

 

2.1          MANUFACTURER

 

A.            planned product: Subject to compliance with native laws and necessities merchandise that will be incorporated within the work embody , however not restricted to the following:

 

1.            Biflex T.C. :- Bifenthrin based mostly

Supplier:             

 

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

2.            Or approved equal.

2.2          MATERIALS

 

A.            General: Use AN emulsible, focused termiticide that dilutes with water, specially developed to stop termites infestation and will not cause pollution   to the setting or toxity to the plantation. fuel shall not be permissible diluents. Offer an answer consisting of 1 of following chemical

 

 

 

 

B.        Environmental friendly product.   

 

1. Low human toxicity .

2. Low odour .

3. No skin irritation .

4. Low pressure .

5. Won’t lurk around your building.

 

C.            toxic chemicals, E.P.A. and native territorial authority approved.

 

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

D.            Dilute as suggested by the toxic manufacturer and approved by the E.P.A. and native territorial authority and S.A.S.O.

 

E.            Certify that toxic can don't have any harmful result on water proofing membranes, coatings and alternative contact materials.

 

PART three - EXECUTION

 

3.1          APPLICATION GENERAL

 

  A.          All application shall go with the manufacturers’ recommendations as enclosed within the approved ITP.  Application shall be created with an occasional pressure power sprayer or a tank sort compression pesticide sprayer.

 

  B.          don't apply soil treatment answer till excavating, filling and grading operations area unit completed, except as otherwise needed in construction operation.  Reapply soil treatment answer to areas disturbed by construction operations following application of soil treatment termiticide answer.

 

  C.          The Contractor shall make sure that no wood or wood product area unit left within the fill.

 

  D.          take away all foreign matter that might decrease effectiveness of treatment on areas to be treated. Loosen, rake and level soil to be treated, except antecedently compacted areas beneath slabs and foundations.  If concrete slabs cannot be poured over soil a similar day it's been treated, a water-resistant cowl of synthetic resin material shall be placed over the treated soil.  Concrete shall be placed as shortly once soil treatment as potential. Sampling and testing shall be administered promptly to expedite putting of concrete.

 

  E.          Application of termiticide answer should be administered in such a way on offer AN unbroken vertical and horizontal chemical barrier between the structures connected with the soil and white ant colonies within the soil.

 

3.2          APPLICATION LOCATION AND RATES

 

  A.          beneath block on grade within foundation walls: wherever fill is well stratified soil, apply four liters of termiticide answer per one sq. meter of soil. wherever fill material is washed gravel or alternative coarse sorbent material, apply six liters of termiticide answer per one sq. meter of soil.

 

  B.          At important area unitas beneath the concrete block on grade within the building line:  Areas enclosed are the within perimeter of foundation walls, each side of interior partition walls on grade beams, the perimeter of column footings, construction joints or enlargement joints in slabs, the perimeter of plumbing pipes, electrical conduits or alternative block penetrations. the world of treatment shall be thought-about to increase a minimum of twenty cm on the far side these locations.  Apply twenty five liters of termiticide answer per centare of soil.

 

  C.          At concrete and/or solid concrete masonry unit footings and foundations: space of treatment shall be thought-about to increase a minimum of twenty cm outside the perimeter of the building line.  Apply five liters of termiticide answer per linear meter of trench to every thirty cm carry from bottom of footing to prime of end grade on the whole outside perimeter of the inspiration.  For foundations but thirty cm deep, a minimum depth of thirty cm from prime of end grade shall be treated.  Termiticide answer could also be mixed with the fill soil because it is placed within the trench excavation or sprayed onto the fill layer of a most thirty cm carry before compaction.

 

  D.          At hollow core concrete masonry unit foundations: additionally to the treatment higher than for footings and foundations treat voids at a rate of eight liters of termiticide answer per linear meter of foundation wall, sprayed into the hollow areas.

 



Post a Comment

0 Comments