METHOD OF STATEMENT FOR EXHAUST FANS
1. Scope of WorkTable of contents
2. Purpose
3. Abbreviations
4. References
4.1 International Codes
4.2 Project Specification
4.3 Client Standards
5. Responsibilities
5.1 Project Manager
5.2 Site Engineer
5.3 QC Supervisor
5.4 The QC Inspector
5.5 The Safety Engineer/Inspector
5.6 The Site Supervisor/Foreman
6. Safety
7. Procedures
1. Scope of work
The scope of this method statement is to define all activities and requirements necessary for
Exhaust fans, Heating, Ventilation and Air Conditioning (HVAC) System at ‘
and to ensure that all works/activities are in full compliance
with project specifications, drawings and Client standards related to installations standards,
verifying Documents comply with Client Typical Inspection Plan (SATIP) related to
installations.
2. Purpose
The purpose of this method statement is to describe the quality control procedure to be followed
During installation of Exhaust fans at Expand Dhahran Residential Community project at Dhahran,
KSA and to detail the instructions to be followed and the documentation to be employed in order
to ensure that safe installation is executed in accordance with the project specifications and
standards.
3. Abbreviations
MS : Method Statement
IC : Client Inspection Checklist
TR : Client Test Report
TIP : Client Typical Inspection Plan
ES : Client Engineering Standards
RFI : Request for Inspection
PID : Project Inspection Department
PMT : Client Project Management Team
ITP : Inspection & Test Plan
NCR : Non Conformance Report
MAIN CONTRACTORS : Main contractors
PM : Project Manager
CM : Construction Manager
PPE : Personal Protective Equipment
QA/QC : Quality Assurance/Quality Control
4. References
4.1 International Codes
· Test Code for Air Moving Devices
· Underwriters’ Laboratories Standard for Safety for Electric Fans
· Test Code for Fans
· Standards Handbook
· Standard Test Code for Sound Rating
· Fans, Standard Classification for Spark Resistant Construction
4.2 Project Specification
§ 40005 - EXHAUST FANS
5. Responsibilities
5.1 Project Manager
To make sure that all preparation and application works square measure disbursed in line with
that contact specifications, technique statement, shopper Engineering Specification
and manufacturer knowledge sheet.
To make sure that the progressing of labor is disbursed in line with the planned
program and as per the approved technique Statement
To make sure that all the hands, instrumentation and materials needed to execute the
Work square measure on the market.
To make sure that all connected quality procedures square measure practiced and enforced.
To make sure that all safety matters associated with this procedure square measure being ascertained.
5.2 construction site Engineer
Coordinate all the location activities in accordance with approved International Finance Corporation & look drawings,
project specification and approved technique statement and shopper Engineering
Standards.
To give all necessary info and distribute responsibilities to his team.
To monitor the progress of labor in relation with work program and to report back to
the PM.
To make sure that the installer is well trained for this kind of labor.
To coordinate with safety officer and to confirm that the works square measure disbursed in safe
practicing technique.
Site engineer shall inform mechanical internal control Inspector for internal review
to check work has been done accordance to International Finance Corporation & look Drawings, Client
Standards before getting ready internal RFI for review and also the time schedule.
5.3 QC Supervisor
Guide the QC Inspectors and monitor their performance at the location
Provide his subordinates with latest approved procedures, material submittals and look
Drawings.
Shall maintain correct filing for reports, RFI and NCRs
Maintain records of internal control check sheets/ reports for web site tests and inspections.
Coordinate with SAPMT representative the desired witnessing of review and tests.
Carry out police work thus on make sure that personal square measure operating in accordance with
approved technique statement.
Assurances of approved strategies square measure getting used for testing and material recipient
inspection.
Verification of fabric approval and trafficker clarification.
5.4 The QC Inspector
To guarantee full compliance of the work with the connected approved technique statement
Responsible to confirm that the right, approved sizes, dimensions.
Ensure that International Finance Corporation drawings, look drawings displayed on web site throughout installation
inspection.
Ensure that the materials being delivered to web site and used square measure in accordance with
the project specifications and approved material submittal and material receiving RFI.
Shall be accountable for the review, preparation of RFI all documents and
compiling them for the inclusion within the final documentation prepackaged.
To maintain comprehensive review and check records for the aim of
reference and documentation.
Ensure arrangement and site of latest discharged for construction drawings, and
specifications.
Ensure that tools/ instrumentation used for testing and commission purpose is graduated
and certificates on the market. (Certificate of standardisation tool are provided throughout
inspection time separately).
5.5 the protection Manager / Inspector
Ensure that the work is performed below the protection measures of the approved HSE set up
Prior to the commencement of any activities, manpower can receive Tool Box on the
project safety demand .This tool box speak can embrace each activity problems likewise
as general safety needs.
To maintain continuous inspections of the location activities, advise and train the
Involved personnel on day after day to forestall accidents, personal injury or
Property harm.
5.6 the location Supervisor/Foreman
Shall have the data of installation of Exhaust fans so as to elucidate the tactic
statement to his subordinates.
To make sure that work is disbursed properly and in line with manufacturer
recommendations and directions received from the location engineer
To make sure that tools, labor and materials square measure on the market
6. Safety
Prior to the commencement of any activities the manpower can receive Tool box speak
on the project safety needs. This tools box speak can embrace each activity problems
as well as general safety needs
Direct supervisor can make sure that Protection Equipment’s, PPE, square measure employed by web site
personnel in the slightest degree times throughout this activity
Ensures that every one system needed for review access is in situ and properly
Tagged
No personnel acting on prime standing on the system platform landing whereas
pushing the system from the situation to a different
Coordinate absolutely with the protection officer so as to take care of safe operating
Condition and correct work of the location.
All instrumentation and accessories are certified for his or her capability and integrity.
Safety and risk assessment shall be performed for each job or task, that has the
potential for hurt.
All personal square measure issued with personal protection instrumentation.
All electrical connections shall be automatically and electrically sound.
7. Procedures:
1. All fans shall be put in in accordance with SMACNA customary or equivalent.
2. The motor and its parts shall be freed from any scrap or alternative materials which is able to impede the
rotation of the pulleys.
3. The motor ANd its parts shall be put in in an accessible manner to produce method for
maintenance.
4. All fans shall be put in thus to extract the air respecting the air flow as laid out in the approved
IFC drawings.
5. the situation of the fans shall be as laid out in the approved International Finance Corporation drawings.
6. The fans shall be put in hanging as laid out in the approved International Finance Corporation drawings.
7. Fans connected to duct ought to be supplied with versatile connection to eliminate transit vibration to
the system.
8. Install electrical and management wiring in accordance with unit wiring diagrams, necrotizing enterocolitis and native
standards.