Ad Code

Responsive Advertisement

Ticker

12/recent/ticker-posts

SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING,

 SITE CLEARING

 

 

SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website
SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website


PART one - GENERAL

 

1.1       DESCRIPTION of labor

 

  A.      The extent of website} clearing is shown on the drawings and includes all site clearing activities needed to put in new facilities, infrastructure and plant at the locations indicated.

 

1.2       JOB CONDITIONS

 

  A.      Protection of Existing Improvements:

 

1.         offer protections necessary to stop injury to existing enhancements indicated to stay in situ.

 

  B.      Salvable Improvements:

 

1.         fastidiously take away things indicated to be salvaged and create disposition as follows:

 

1.3       QUALITY ASSURANCE

 

SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements
SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website

  A.      Ministry of Transportation of Kingdom of Saudi Arabia Specifications for Roads and Bridges:

 

            1.         Section 2.01:  Clearing and Grubbing

 

            2.         Section 2.06:  Removal of structures and Obstructions

 

            3.         Section 2.08:  Disposal of Surplus Material

 

 

PART two - product

 

2.1       NOT APPLICABLE.

  

PART three - EXECUTION

 

3.1       SITE CLEARING

 

SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website
SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website


  A.      General:

 

            1.         take away such things on the positioning or premises as specifically indicated.

 

2.         aside from things united to by Owner to be allowed to stay in situ, take away vegetation, enhancements, or obstructions busy with installation of latest construction.  Removal includes any concrete, stumps and roots.

 

  B.      dirt (Salvageable):

 

1.         dirt is outlined as fairly freed from soil, clay lumps, stones, and alternative objects over seventy five millimeter. in diameter.

 

2.         Strip soil to no matter depths encountered in an exceedingly manner to stop intermingling with the underlying soil or alternative objectionable material.

 

3.         Stockpile dirt in storage piles in areas for later use or wherever otherwise directed.  Construct storage piles and canopy storage piles if needed to stop crooked dirt.

 

            4.         get rid of dirt as such as herein.

 

  C.      Clearing and Grubbing:

 

SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website
SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website


1.         Clear the positioning of shrubs and alternative vegetation. fully take away stumps, roots and alternative scrap jutting through the bottom surface.

 

2.         Fill depressions caused by clearing and grubbing operations with satisfactory dirt material unless any excavation or bulwark is indicated. Place fill material in horizontal layers not prodigious a hundred and fifty millimeter. loose depth, and completely compacted to a density adequate adjacent original ground.

   D.      Removal of Improvements: take away above-grade and below-grade enhancements as necessary to allow new construction work, as shown within the drawings. acquire written permission from Owner to relocate any existing permanent utilities, if such utilities ar in conflict with the development of latest work.

   E.       Spoils ensuing from web site clearing shall not be deposited on or in any kind of water-body or ground.  Spoil and excess surface soil shall be disposed of at the Owner landfill facility.


  

Post a Comment

0 Comments