project quality plan Quality Management System Procedures QMSP

  project quality plan Quality Management System Procedures QMSP

WWW.HVACMEPCONTRACTORS.COM project quality plan Quality Management System Procedures QMSP
WWW.HVACMEPCONTRACTORS.COM project quality plan Quality Management System Procedures QMSP


Table of Contents:

 

 

Section 1                  Scope

 

Section 2                  Normative Reference

 

Section 3                  Terms and Definitions

 

Section 4                  Quality Management System

 

Section 5                  Management Responsibility

 

Section 6                  Resource Management

 

Section 7                  Project Execution / Product Realization

 

Section 8                  Measurement, Analysis and Improvement

 

Section 9                  Quality Management System Procedures (QMSP)

 

Section 10                Quality Work Instructions (QWI)

 

Section 11                Inspection & Test Plans (ITP)

 

PROJECT QUALITY PLAN

 

CONTROLLED COPIES

 

 

 

DISTRIBUTION LIST                                                                             

 

 

ORGANIZATION

 

DISTRIBUTION

 

 

DATE ISSUED

 

RECEIVED BY:

 

SIGNATURE /DATE

 

QA/QC Manager

Hvacmep.webstie

MASTER COPY

 

 

 

 

 

Project Engineer

client

 

CONTROLLED COPY #1

 

 

 

 

General Manager

Hvacmep.webstie

CONTROLLED COPY #2

 

 

 

 

Projects Inspection Division

CONTROLLED COPY # 3

 

 

 

 

FOREWORD: STATEMENT OF AUTHORITY

 

This document comprises the Project Quality Plan, and is issued with my authority.

 

All Departmental Heads shall generate procedures that detail the method of, and responsibilities for implementation of those requirements of this document, which apply to their activities.

 

All personnel within this organization shall perform their duties in accordance with the requirements of this document and in compliance with departmental procedures.

 

This document also contains QA/QC requirements that are contractually imposed by our client.  The QA/QC Manager/Engineer shall be responsible to the undersigned for the implementation due to account being taken of the classification and nature of the item or services in question.

 

The QA/QC Manager/Engineer is authorized by the undersigned to identify quality problems and to initiate, recommend and provide solution thereto.  He is further authorized to prevent further processing of non-conforming items or activities until the non-conformance is satisfactorily corrected.

 

The QA/QC Manager/Engineer shall maintain and control the issue of this document, shall verify implementation of its requirements and shall regularly report to the undersigned on the status and effectiveness of its implementation.

The QA/QC Manager/Engineer shall ensure that all QA/QC functions are performed to ascertain that all fabrication, construction and pre-commissioning are in accordance with the requirements of:

 

a)   Approved Fabrication and Construction Drawing.

b)   Saudi HVACMEP.WEBSITE Construction & Engineering Standards, General Instructions & Specifications.

c)   “Approved for Construction” Fabrication Procedure and Specification.

d)   Approved Project Quality Plan.

 

Any disputes concerning implementation of the requirements of these documents shall be referred to the undersigned for solution.  Any resolutions arrived at by the Project / Construction Manager, will be without compromise to the approved project quality plan, Saudi HVACMEP.WEBSITE Engineering Standards or, any other national, or international standards as applicable.

 

1.0       Scope:

 

 

 

Scope shall cover the specific requirements of the project which shall include but not limited to the following:

 

 

 

A.    Project Description

 

 

A.1       Process Description

 

 

A.2       Project Scope of Work

 

 

a.         Civil / Structural

 

 

b.         Piping

 

 

c.         Electrical / Cathodic Protection

 

 

d.         Instrumentation

 

 

e.         Painting and Coating

 

2.0       Normative Reference:

 

                                                Quality Management Systems –Fundamentals and Vocabulary

 

                                                Quality Management Systems –Requirements

 

Schedule ‘Q’                           Quality Requirements

 

                                                Security and Control of Saudi HVACMEP.WEBSITE Engineering Data

 

                                                Instructions for Obtaining a Waiver of a Mandatory Saudi HVACMEP.WEBSITE Engineering Requirements

 

                                                Engineering Reviews of Project Proposal and Detail Design Documentation

3.0       Terms and Definitions:

 

For the purpose of this Project Quality Plan the following terms and definitions in addition to terms and definitions given in ISO 9000:2008 and hvacmep standards shall apply and have the meaning indicated in this section. No attempt is made to define ordinary words which are used in accordance with their established dictionary meaning. Below lists of terms and definitions to be used in this Quality Plan:

 

Acceptance Criteria

Defined limits placed on characteristics, materials and services.

 

Audit

A systematic and independent examination to determine whether quality activities and related results comply with planned arrangements and whether these arrangements are implemented effectively and are suitable to achieve objectives.

 

Calibration

Comparison and adjustment to a known standard of accuracy.

 

Complaint

A deviation from contractual obligation.

 

Conformance

Compliance with specified requirements.

 

Concession

Written authority to use or release a quantity of material, components or stores already produced, but which do not conform to the specified requirements.

 

Contract Review

A review of the baseline contract documents, including any documents amending the baseline contract documentation.

 

Control

To exercise authority over and regulate.

 

Control Feature

A documented activity to ensure conformance with specific requirements of applicable specifications.

 

Corrective Action

Actions identified by investigating the cause of non-conformity identified within the appropriate quality procedures and quality work instructions.

 

Preventive Actions

Actions identified by the analysis of quality records (costumer complaints, audit results etc.) identified within the appropriate quality procedures.

 

Customer Satisfaction

Degree of perception to which customer’s requirements been fulfilled.

 

Defect

The non-fulfillment of intended usage requirements.

 

Documentation

Recorded information.

 

Equipment

Any simple completed unit that can be used for its intended purpose without further processing or assembly.

 

Failure

Any condition which prevents the service or product from performing its specified function.

 

Finding

Objective evidence that a feature of the approved quality program was not implemented.

 

Grade

An indicator of category or rank related to features or characteristics that cover different sets of needs for services intended for the same functional use.

 

Hold Point

Inspection or test may not proceed without the QC organization representative in attendance.

 

Inspection

 

 

Activities such as measuring, examining, testing, gauging one or more characteristics of a service and comparing these to specified requirements to determine conformity.

 

Inspection & Test Plan (ITP)

A document that provides detailed procedure on work execution and steps of inspection requirements.

 

Inspection Assignment Package

A set of documents that include details of purchased material/equipment and their quality requirements needed to perform full inspection at the vendor/sub-vendor facility.

Non-conformity

The non-fulfillment of specified requirements.

 

Objective Evidence

 

Facts which are observed and documented.

 

Observation

Evidence that a surveyable /audible element exists which is not contrary to documented requirements, but may warrant further qualification or improvement.

 

Parts

 

 

Procedure

Individual pieces used in the assembly of single equipment units.

 

A document defining the purpose and scope of an activity or process and outlining how, when and where and by whom the activity or process shall be carried out.

 

Process

Set of interrelated or interacting activities which transform inputs to outputs.

 

Product

Result of a process.

 

Pre-Commissioning

Testing of system components for continuity, operability and in the case of the process plants, their ability to withstand operating pressure prior to the introduction of feedstock or other final products into the facility.

Quality            Conformance to nominative needs.

 

Quality Assurance    All those planned and systematic actions necessary to supply adequate confidence that a service can satisfy given needs for quality.

 

Quality Control         The operational techniques and activities that ar accustomed fulfill needs for quality.

 

Quality Plan   Document specifying that procedures and associated resources shall be applied by whom and once to a particular project, product, method or contract.

 

Quality Procedure (QP)       A document that specifies or describes however Associate in Nursing activity is to be performed. it's going to embrace strategies to be used, instrumentality to be used and sequence of operations.

 

Quality System          The structure structure, procedures, processes and resources for implementing quality management.

 

Quality System Review        A formal analysis by prime management of the standing and adequacy of the standard system in reference to quality policy and new objectives ensuing from ever-changing circumstances.

 

Requirement  Need or expectation that's expressed, usually silent or obligatory.

Servicing        Supplier activities at the interface with a shopper and also the results of all provider activities to satisfy the shopper desires.

 

Shall   Expresses a provision that's binding between 2 or additional parties.

 

Should            Expresses a recommendation among alternative potentialities.

Subcontractor           Any individual or organization that furnishes materials or services.

 

Specification The document that prescribes the wants with that the service should adjust.

 

Traceability    The ability to trace the history, application or location of Associate in Nursing item or activity, or similar things or activities, by suggests that of recorded identification.

 

Type Test       Test or series of tests directed towards approval of a style conducted to work out that's capable of meeting the wants of the merchandise specifications.

Vendor           Any individual or organization that furnishes materials or services.

 

Verify  To verify conformity to nominative needs.

 

Will      Expresses a declaration or purpose or intent by one party.

 

Witness Point            It defines a degree that gives QA/QC organization with the chance to attend the scrutiny & check, at their choice.

 

Work Instruction       A document that gives elaborate “How To” directions to accomplish the activities and make sure that work shall start, completed and tested in accordance with shopper (Saudi HVACMEP.WEBSITE) standards.

 

 

 

 

1.         Purpose :

 

            To  establish,  document,  implement  and  maintain  a  quality  work  instruction  for  installation  and scrutiny  of  grounding  system  for the project.

 

           

2.         Scope :

 

The  scope  covers  the  Grounding / grounding  System  for  General electrical  and  Instrumentation  as outline  in  the  scope  of  work.

 

 

3.         Reference :

 

                        Wiring strategies  and  Materials

                        Electrical space  Classification

 

                        Lighting

 

                        Grounding

 

                         For conjunction /Terminations

 

                         National electrical  Code

 

                        _

                                               

 

HVACMEP  Issued  for  Construction  Drawings (IFC)

 

 

4.         Procedure :

 

1.         Quality listing

 

a)         QC  Electrical  Inspector  shall guarantee,  that  materials  and instrumentality ar handled  in  accordance  with  applicable  quality  procedure outline  in  this  manual,  that equipped  materials  conforms  with  material  specifications  and  that  all  grounding  materials  for  terminations, conjunction  among  others ar keep  in  a  safe  place  free  from mud  and  protected  from part  action  and  dirt.

 

b)         Grounding  conductors  shall  be  soft  drawn  copper  unless nominative  on  the  approved  for  construction  drawings.  Direct  buried  grounding  conductors  connecting  to  the instrumentality  to  ground  grids perhaps international organisation –insulated  or inexperienced  PVC  insulated (these  grounding  conductors  do  not  substitute  grounding  conductors needed  by  HVACMEP.WEBSITE –P –111  paragraph half-dozen.3),  Reference  HVACMEP.WEBSITE –P –111  paragraph five.1  and  5.2.

 

c)         Grounding  grid  conductors  shall  be  a  minimum  of seventy metric linear unit square (#2/0 AWG) vacant  copper. preserved  copper  conductors  shall  be  used  whenever  soil ohmic resistance  is  less  than seventy ohm –meter..  Reference  HVACMEP.WEBSITE –P –111,  paragraph five.1.

 

d)         All  exposed  no –current  carrying  metal elements  of instrumentality  and  sizeable gold  objects  such  as  fences,  piping,  piping  supports,  motors,  electrical  panels,  switch gear,  MCC’s,  fixtures,  ground  terminals  of every  receptacle, passage  metal  tanks  and  pumps  shall  be probably secure  to  grounding  grid consequently.

 

e)         Conduit,  cable receptacle,  cable  wire  armor  or  cable  shields  shall  not  be  the  sole suggests that  of  grounding instrumentality.  Separate  grounding  conductors  shall  be put in inside  the  same passage,  cable receptacle  or  otherwise  shall  accompany  with  the  power  conductors. gold  conduits,  cable  trays  shall  be  grounded  at each  ends.  Reference  HVACMEP.WEBSITE –P –111,  paragraph nine.

 

f)          Check  to guarantee  that  installation  of  materials will  not  conflict  with alternative  services  or instrumentality  and put in  in  accordance  with  manufacturer’s  recommendations.

 

g)         All  buried  or hid affiliation  and  splices  for  grounding  system  shall  be  inspected  and  approved  by  Saudi  HVACMEP.WEBSITE  Inspector previous  to  concealment.

 

2.         Installation

 

I.          grounding /Grounding  of  Electrical instrumentality

 

a)         Installation  shall  be  in  accordance  with  ANSI /NFPA seventy  and  the website  soil ohmic resistance  shall  be  measured  in  accordance  with  IEEE eight.1  and  in conformity  with  HVACMEP.WEBSITE –P –111.

 

b)         Grounding  rod  locations can  be  check  against  the  approved  for  construction  drawings.

 

           Where  rod ar  to  be  “Hand  driven”  the  procedure can  be  witnessed  to guarantee  the  correct  depth  or  “Refusal”  is  achieved. wherever  rods ar  to  be put in  in  pre –drilled  bore  holes,  the  bore  holes can  be  check  to guarantee  the  correct  depth  is  achieved  and  the  back fill  materials  is  as  per  specification.

 

           Upon  completion,  the  installation  of  earth  pit  and  ground  rod  termination  and  the  disconnecting  of  facilities  shall  be  check /verified  against  specific  installation  details.

 

c)         The  location  of  earth  busbars can  be  checked  against  the  layout  drawings  and  the  assemblies  check  to guarantee  the  fixing ar  secure.

 

d)         Underground  brazed  joints  or  cad welds  connections  shall  be  inspected  to guarantee correct  mechanical  and  electrical  bonding.

 

e)         Equipment  shall  be  inspected  to guarantee  that  earth  bonding  facilities ar put in  and situated  as  per elaborate  drawings. explicit  attention  to instrumentality,  such  as  floating  roof  tanks, that need  special  devices.  The bonding  points  on  gates  etc. that ar  subject  to  frequent  movement can  be  inspected  to guarantee  the  fixing  is  secure.

 

f)          The  termination  of  the  earth  cables  shall  be  inspected  to guarantee  the  crimping  thermite attachment  and /or  bolting  is  secure  and wherever  applicable,  protected  against  corrosion.

I.              Quality Conformance to given needs.

II.             

III.           Quality Assurance      All those planned and systematic actions necessary to supply adequate confidence that a service can satisfy given needs for quality.

IV.           

V.            Quality Control            The operational techniques and activities that area unit accustomed fulfill needs for quality.

VI.           

VII.         Quality Plan    Document specifying that procedures and associated resources shall be applied by whom and once to a particular project, product, method or contract.

VIII.         

IX.          Quality Procedure (QP)          A document that specifies or describes however associate degree activity is to be performed. it should embrace ways to be used, instrumentality to be used and sequence of operations.

X.             

XI.          Quality System           The structure structure, procedures, processes and resources for implementing quality management.

XII.          

XIII.        Quality System Review          A formal analysis by prime management of the standing and adequacy of the standard system in reference to quality policy and new objectives ensuing from dynamical circumstances.

XIV.        

XV.        Requirement   Need or expectation that's declared, usually inexplicit or obligatory.

XVI.       Servicing         Supplier activities at the interface with a consumer and also the results of all provider activities to fulfill the consumer wants.

XVII.       

XVIII.    Shall    Expresses a provision that's binding between 2 or a lot of parties.

XIX.        

XX.        Should Expresses a recommendation among different potentialities.

XXI.       Subcontractor Any individual or organization that furnishes materials or services.

XXII.       

XXIII.    Specification   The document that prescribes the necessities with that the service has got to adapt.

XXIV.     

XXV.     Traceability     The ability to trace the history, application or location of associate degree item or activity, or similar things or activities, by suggests that of recorded identification.

XXVI.     

XXVII.  Type Test        Test or series of tests directed towards approval of a style conducted to work out that's capable of meeting the necessities of the merchandise specifications.

XXVIII. Vendor Any individual or organization that furnishes materials or services.

XXIX.     

XXX.     Verify  To confirm correspondence to given needs.

XXXI.     

XXXII.  Will      Expresses a declaration or purpose or intent by one party.

XXXIII.  

XXXIV.Witness Point  It defines a degree that has QA/QC organization with the chance to attend the scrutiny & check, at their choice.

XXXV.   

XXXVI.Work Instruction          A document that has elaborate “How To” directions to accomplish the activities and make sure that work shall start, completed and tested in accordance with consumer (Saudi HVACMEP.WEBSITE) standards.

XXXVII.                

XXXVIII.               

XXXIX. 

XL.          

XLI.        1.         Purpose :

XLII.       

XLIII.                 To  establish,  document,  implement  and  maintain  a  quality  work  instruction  for  installation  and scrutiny  of  grounding  system  for the project.

XLIV.     

XLV.                 

XLVI.    2.         Scope :

XLVII.    

XLVIII.  The  scope  covers  the  Grounding / grounding  System  for  General electrical  and  Instrumentation  as outline  in  the  scope  of  work.

XLIX.     

L.             

LI.           3.         Reference :

LII.           

LIII.                                Wiring ways  and  Materials

LIV.                                Electrical space  Classification

LV.          

LVI.                                Lighting

LVII.       

LVIII.                             Grounding

LIX.         

LX.                                  For junction /Terminations

LXI.         

LXII.                               National electrical  Code

LXIII.      

LXIV.                            _

LXV.                                                     

LXVI.     

LXVII.   HVACMEP  Issued  for  Construction  Drawings (IFC)

LXVIII.   

LXIX.     

LXX.      4.         Procedure :

LXXI.     

LXXII.   1.         Quality list

LXXIII.   

LXXIV. a)         QC  Electrical  Inspector  shall guarantee,  that  materials  and instrumentality area unit handled  in  accordance  with  applicable  quality  procedure outline  in  this  manual,  that equipped  materials  conforms  with  material  specifications  and  that  all  grounding  materials  for  terminations, junction  among  others area unit keep  in  a  safe  place  free  from mud  and  protected  from part  action  and  dirt.

LXXV.   

LXXVI. b)         Grounding  conductors  shall  be  soft  drawn  copper  unless given  on  the  approved  for  construction  drawings.  Direct  buried  grounding  conductors  connecting  to  the instrumentality  to  ground  grids perhaps global organization –insulated  or inexperienced  PVC  insulated (these  grounding  conductors  do  not  substitute  grounding  conductors needed  by  HVACMEP.WEBSITE –P –111  paragraph half dozen.3),  Reference  HVACMEP.WEBSITE –P –111  paragraph five.1  and  5.2.

LXXVII.                 

LXXVIII.              c)         Grounding  grid  conductors  shall  be  a  minimum  of seventy millimeter square (#2/0 AWG) clean  copper. preserved  copper  conductors  shall  be  used  whenever  soil electrical resistance  is  less  than seventy ohm –meter..  Reference  HVACMEP.WEBSITE –P –111,  paragraph five.1.

LXXIX.  

LXXX.  d)         All  exposed  no –current  carrying  metal components  of instrumentality  and  sizeable tinny  objects  such  as  fences,  piping,  piping  supports,  motors,  electrical  panels,  switch gear,  MCC’s,  fixtures,  ground  terminals  of every  receptacle, passage  metal  tanks  and  pumps  shall  be doubtless guaranteed  to  grounding  grid consequently.

LXXXI.  

LXXXII.                e)         Conduit,  cable receptacle,  cable  wire  armor  or  cable  shields  shall  not  be  the  sole suggests that  of  grounding instrumentality.  Separate  grounding  conductors  shall  be put in among  the  same passage,  cable receptacle  or  otherwise  shall  accompany  with  the  power  conductors. tinny  conduits,  cable  trays  shall  be  grounded  at each  ends.  Reference  HVACMEP.WEBSITE –P –111,  paragraph nine.

LXXXIII.               

LXXXIV.              f)          Check  to guarantee  that  installation  of  materials will  not  conflict  with different  services  or instrumentality  and put in  in  accordance  with  manufacturer’s  recommendations.

LXXXV.                

LXXXVI.              g)         All  buried  or hid association  and  splices  for  grounding  system  shall  be  inspected  and  approved  by  Saudi  HVACMEP.WEBSITE  Inspector previous  to  concealment.

LXXXVII.             

LXXXVIII.           2.         Installation

LXXXIX.               

XC.        I.          grounding /Grounding  of  Electrical instrumentality

XCI.        

XCII.     a)         Installation  shall  be  in  accordance  with  ANSI /NFPA seventy  and  the web site  soil electrical resistance  shall  be  measured  in  accordance  with  IEEE eight.1  and  in correspondence  with  HVACMEP.WEBSITE –P –111.

XCIII.     

XCIV.   b)         Grounding  rod  locations can  be  check  against  the  approved  for  construction  drawings.

XCV.      

XCVI.              Where  rod area unit  to  be  “Hand  driven”  the  procedure can  be  witnessed  to guarantee  the  correct  depth  or  “Refusal”  is  achieved. wherever  rods area unit  to  be put in  in  pre –drilled  bore  holes,  the  bore  holes can  be  check  to guarantee  the  correct  depth  is  achieved  and  the  back fill  materials  is  as  per  specification.

XCVII.   

XCVIII.            Upon  completion,  the  installation  of  earth  pit  and  ground  rod  termination  and  the  disconnecting  of  facilities  shall  be  check /verified  against  specific  installation  details.

XCIX.    

C.           c)         The  location  of  earth  busbars can  be  checked  against  the  layout  drawings  and  the  assemblies  check  to guarantee  the  fixing area unit  secure.

CI.           

CII.         d)         Underground  brazed  joints  or  cad welds  connections  shall  be  inspected  to guarantee correct  mechanical  and  electrical  bonding.

CIII.        

CIV.       e)         Equipment  shall  be  inspected  to guarantee  that  earth  bonding  facilities area unit put in  and set  as  per elaborate  drawings. specific  attention  to instrumentality,  such  as  floating  roof  tanks, that need  special  devices.  The bonding  points  on  gates  etc. that area unit  subject  to  frequent  movement can  be  inspected  to guarantee  the  fixing  is  secure.

CV.         

CVI.        f)          The  termination  of  the  earth  cables  shall  be  inspected  to guarantee  the  crimping  thermite attachment  and /or  bolting  is  secure  and wherever  applicable,  protected  against  corrosion.