Only use modular units after they have been securely mounted and fitted with protection guards
to suit the application (suitable and tested guards can be supplied on request). - Installation, electrical and mechanical maintenance and service should only be undertaken by qualified personnel! - The modular unit must only be used according to its design parameters, with regard to performance (F data plate) and mediums passing through it! The RAL modular and air handling units fulfil the quality requirements of the RAL/RLT Quality Association. Both air handlicng units series, made from steel profile, and RAL-RLT units are constructed on the modular system and therefore can be produced and installed in any position. They are used for heating, cooling, filtering, mixing air and for heat recovery. Their operative range is for air volumes of 500 m³/h up to 100000 m³/h. Weatherproof units Weatherproof units are suitable for outdoor installation (e.g. on flat roofs etc.) They are equipped e. g. with a weather proof roof as well as a weather protection guard or alternatively inlet- and outlet cover and a base frame. The outside of the casing is plastic coated. Hygienic units Hygienic units are suitable for use under special hygienic conditions, as e.g. in hospitals or in the food area. The sheet metal parts are coated or made of especially corrosion resisting materials. The floors are flat for easy cleaning. For cleaning and maintenance purposes the built-in components are easily accessible and partly withdrawable (e.g. filters). The installed radial fans can be used for ventilation of: - clean air - slightly dusty and greasy air - slightly aggresive gases and fumes - mediums up to an atmospheric density of 1,3 kg/m³ - mediums up to a max. humidity of 95% Store components in a dry place and weather protected in its original packing. - Cover open pallets with tarpaulin and protect the fans against dirt (e.g. stones, splinters, wires, etc.). Even weatherproof modules must be covered as their weather resistance is only guaranteed after installation. · Storage temperatures between -30° C and 40° C With storage duration of more than 1 year please check bearings on soft running before mounting ( Fturn by hand). · The modules can be transported with forklifts and cranes. If transport is done with cranes, the use of straps is required, possibly on jack rings if available (F Page 6, Drawing 1) (F weight as per unit data sheet). - Avoid distortion of casing or other damages. · Use suitable assembling means as e.g. scaffolds conforming to specifications. · Prior to lifting modules, lock all service and access doors. Installation and electric work must be performed by skilled and qualified personnel only and in accordance to applicable regulations and manufacturers instructions. Service doors of the modules on pressure side must be equipped with a safety lock for pressure reduction. With hygienic units · Supply water for heat exchanger and other units with water consumption must have the quality of drinking water! · Unevenness due to casing disconnection in the floor area must be sealed with leakproof material. We recommend disinfectant proof sealing material „duct sealing material / Lüftungskanaldichtmittel“ (LKD) coloured silvergrey, transparent or white from company Adolf Würth GmbH & Co. KG, Posfach, D-74650 Künzelsau, Germany · Air damper mounted inside or insulated (double boarded with insulation inbetween) With weatherproof units · The supplied weather-protection roof must be mounted on all units installed outdoor. Before installing remove transport cornerpieces (when available)! · Units must be assembled on a rigid, level foundation or other supporting structures. F Style and design of foundation must meet the requirements for acoustic, and for the professional draining of water from drop eliminator and humidifier on site. (Attention to height of syphon!) · When installing units on impact sound insulation bases between unit and foundation, apply the following procedure. - Using a marker draw a ground plan of the complete unit on the foundation. - Place rubber strips on foundation according to outline. - Positioning in true alignment of assembled units with rubber strips. · The flexible connections between duct and air handling unit must be tension free when mounted. Mounted length of the flexible connection must be shorter than the extended length. · The modules must be assembled and positioned prior to connecting them with supplied mounting material. (Drawing 2 and 3) Pos. 1: Frame profile vertical Pos. 2: Frame profile horizontal Pos. 3: Module connector Pos. 4: Bottom connecting plate (hygienical execution) Pos. 5: Sealing tape Pos. 1: Frame profile vertical Pos. 2: Frame profile horizontal Pos. 3: Module connector Pos. 4: Bottom connecting plate (hygienical execution) Procedure · Stick on the sealing tapes (5) on lateral edges. · Bring modules in position. · Connect modules: a) With standard or weatherproof untis - Connect pre-mounted sheet steel corner plates with hexagon bolts M8x120 resp. M8x100 (drawing 2). - Mount additional connecting clamps (drawing 3). Size Number of connecting clamps 07Q - 13R None 13Q - 16Q 4 in all, 1 clamp per side from 20R 8 in all, 2 clamps per side b) With hygienic units (use of special steel screws): - Fix modules by sheet steel corner plates on top (drawing 2) and connecting clamps 3 (drawing 3) by screws. - Fix bottom connecting plate 4 (special steel (V2A)-screw with cover). - Seal edge with disinfectant proof silicone substitute. We recommend „duct sealing material / Electrical connections for built-in components i.e. motors for fans and pumps, electric heaters, actuators etc. must be in accordance to manufacturers instructions and local ordinances. Electric heating coils must be equipped with a safety switch according to VDE 0100 Part 420. The safety switch must be inspected for proper operation after initial installation and after long periods of downtime. During maintenance of the air handling unit, the electric heating coil has to be checked for dirt and cleaned if necessary. If provided, ground cables on flexible connections of fan and duct must be inspected for proper fixing and retightened if necessary.
Eletrical connections: In accordance with technical association rules, native ordinances and national electrical codes. Power provide appreciate knowledge on knowledge plate. Motor to be wired per schematic in junction box. Electrical cables inside the unit should be long enough to alter displacing of the motor for tension changes of belts with none difficulties. F With FC-operation: The supply line to the motor should be with secure cables in accordance to rules of the magnetic attraction compatibility Motor Protection: a) Through thermal contacts (thermal contact in winding) direct driven fans through speed manageable external rotor motors. In order to stop a restart once malfunction thermal contacts for motor protection should be put in. Through motor protection switches, with operation of fans with normal motor and belt-drive. Before management of direction of rotation Remove any foreign matter from fan. Check blade rotation by hand for swish running. •Install protection guards (accessories) or stop quick access to fan. •Switch on for a brief amount to visualize direction of rotation as per direction arrow by short turning on. With wrong rotation direction a motor overload is possible! with 3-phase motor change of rotation direction presumably by interchanging of 2 phases. with 1-phase motor Change rotation direction if neccessary by exchanging Z1(black) and Z2 (orange) (® amendment of current direction in secondary.) Prepare fan for initial operation: correct mechanical installation? electrical installation in accordance with regulations? removal of foreign matters from recess and outlet space and from within fan? transport protection on fan base frame removed? belt tension all right? (maintenance) protection guard (accessories) put in, access to fan prevented or fan is put in out of arm sweep, maintenance doors closed? If the fan is started beneath free blow conditions, i.e. before connecting to ducting system, this consumption might exceed the traditional maximum (forbidden space of performance curve)! Ã the thermal protection of the motor could also be activated! Max. fan speed for RAL-units as per knowledge plate should not be exceeded! Initial operation of fan Observe correct operate ( smoothness of running, vibration, imbalance, current consumption all told 3 phases, and doable controllability ). Always keep intakes free! throughout regular scrutiny of the fan recess, make sure rubbish has not collected on the guard and clean if necessary!! Air Dampers All screw fittings and connections should be tested for ample tightness. once victimisation associate mechanism, adjust gear that a 90° swing angle is secure and shutters reach finish position once closed. A scale on the adjusting lever shows the damper position. •Prepare Air Damper for initial operation Correct mechanical installation? In case many shutters ar connected, the connecting gears should be checked. All screw fittings and connections should be tested for ample tightness. Swing angle of 90° secure (Do shutters reach finish position once closed)? Actuators properly connected ( makers instructions)? •Lever and kit ar protected so as to avoid touching Drawing 4 duct system
Mechanic decoupling with healthful units When connecting the mechanic decoupling with the duct system beware that the connecting bolts don't get in golden contact to air handling unit or duct system. self-enclosed rubber gaskets with bulge should bismuth inserted! Bag Filter parts The bag filters have to be compelled to be mounted in frames victimisation tension clamps. Check for air tight setting of filter in filter frame. Filter should not be broken (filter are going to be instable). Heating Coil (PWW) Caution! once connecting pipes, connect water recess and water outlet properly (in general reverse direction flow with water recess settled on air outlet side). Pipe connections should be flanged on high or on facet of the air handling unit, permitting straightforward removal of coils for maintenance and repair. Cooling Coil (PKW) Caution! once connecting pipes, connect water recess and water outlet properly (in general reverse direction flow with water recess settled on air outlet side) According to acoustic demands, pipes ar to be connected with or while not elastic compensators. Pipe connections should be flanged on high or on facet of the air handling unit, allowing easy removal of coils for maintenance and repair. If atmospheric phenomenon tubes, drains and overflow pipes ar out there, check that that externally settled connections ar connected to a syphon with safety for nonreturn flap and self-filling (depending on size fix a syphon with transition piece on drain). the peak of the syphon should be in accordance with excess pressure and air mass of the standard unit so as to avoid suction and exhaust of air from drain pipes. The exhausting of atmospheric phenomenon needs to be done unpressurized. Heat exchangers ar withdrawable. Connecting pipes should be flanged in a way that the warmth money dealer will be withdrawn once the rim association is unsnarled. When connecting coils with rib on pipes, foot-dragging device on connecting sleeves once adjustment to avoid damages. •Frost protection frames ar withdrawable (if available) Prepare Heating Coil (PWW) for initial operation Correct installation of all mechanical parts and connecting pipes? Thorough deaeration of Heating Coil once filling with water. When neccessary retighten screws ( FInstallation). For long periods of time period and particularly throughout cooling conditions, the cooling coil and connections should be utterly empty. Use compressed gas to get rid of residual water and take away all drain valves and vent screws.
Electric Air Heater Electric Air Heater should be equipped with safety temperature electrical circuit and manual reset button. Fan should have run-on-function. F info to run-on period: see unit. Prepare Electric-Air Heaters for initial operation Correct mechanical installation? Electric installation in accordance with regulations? Safety temperature electrical circuit and flow scrutiny properly adjusted and in operation? Run-on-period of fan properly adjusted and checked? Air washer Follow manufacturer’s instructions! Please note that the likelihood of darkening should tend throughout installation. Protection against dry-running should be properly put in. A device for clearing from silt should be installed! When water is current, an explicit amount needs to get replaced by H2O. Prepare Air Heater for initial operation Follow manufacturer’s instructions! Correct mechanical installation? Electrical installation in accordance with regulations? Rotation wheel device Assembly and electrical connections as per manufacturer’s directions. Prepare Rotation Wheel device for Initital Operation (follow manufacturer’s instructions): Rotor should rotate free! watch out that no objects or too firmly mounted felts block rotor. Correct direction of rotation? Plate money handler Condensate drain should be put in on exhaust air facet. Sound electrical device If a resonator (foil strip covering) is on the market it should be connected on body of water facet. Equipotential Bonding Equipotential bonding with sanitary units between the modules: Equipotential bonding should be mounted on every module. take away coating on the spots wherever ring eye meets equipotential bonding, so the equipotential bonding is feasible (metalic uninsulated surface). Installation, service and electrical work to be performed solely by skilled and qualified personnel and in accordance to applicable regulations and makers instructions! Only use original spare elements factory-made and provided by Rosenberg. (If required please raise the provider for the whole spare list.) Only use business cleansing agents listening to the prescribed safety measures and don't use any abrasive tools (surface protection can be destroyed) Drain channels for cleansing functions should be closed properly once cleaning! Before any maintenance work is undertaken please: Stop fan and different electrical elements in accordance to laws and disconnect all poles from mains offer. Wait till vane is stationary! Make positive that a restart isn't possible! Maintenance conclusion of water circuit. make certain that a restart is not potential. Let device relax. Clean Fan Module Clean intake. Clean vane (if neccessary take away protection guard) FDo not flood motor! Do not bend vane blades! Install protection guard. Open atmospheric phenomenon drains (if available) for cleansing functions and shut them after cleansing properly. Inspection of Belts and Pulleys The belts and pulleys ought to be ascertained often throughout the primary hours of operation. After 0,5 to four hours of full load operation and so once approx. twenty four operating hours the belts and pulleys have to be checked once more and retensioned if neccessary. Remove belt protection. Check belts in line with drawing five. If neccessary retension belts 1. Loosen clamping screws on facet of motor rail. 2. Tension belts by adjusting protection screw as required. Fasten clamping screw on motor rail. Install belt protection. If replacement of fan belts is needed, loosen belt drive! Drawing 5 Drawing 6 Bearing clearance too large? Bearing stuff leaking? Surface affected (aggresive medium)? Unusual operation noises? Fan performance for presumably extended duct system sufficient (® overload)? Air Dampers Periodically (every three months) check on: Performance Dirt, soil or different foreign matters Damages Corrosion Parts square measure mounted firmly Moving elements move swimmingly and simply If necessary Lubricate bearings(plastic bearings don't need lubricating) Clean Change of bag filter (withdrawable filter) / Clean filter fixing Open maintenance door. Remove fastening components on high and bottom with door key or a screwdriver. Change filter components. Pay attention to correct protection. Press on fastening part (door can not be closed if not properly mounted). Close maintenance door. Heat Exchanger Section (Low Pressure heat Water or air mass Cold Water) Heat Exchanger Section (Low Pressure Warm Water or Low Pressure Cold Water) Badly bedraggled heat exchangers square measure restricted in their perform and therefore should be cleansed at once. to wash laminas use a vacuum cleaner, compressed gas or a soft brush. ne'er use onerous or sharp objects to wash heat exchangers! Frost protection thermostat Frost protection thermostats square measure simply accessible and may be adjusted via a maintenance door. If frost protection thermostats square measure mounted in frames those square measure withdrawable. Air washer Follow manufacturer’s directions. Install darking risk when improvement. Functional check of dry-running protection and sludge-drain appliance. Sound electrical device Sound attenuators of sanitary unit square measure withdrawable. Clean with a moist textile if necessary. Rotation Wheel device Due to the counter-current principle in most cases there's a self purification. However, if there ought to be dirtying, the rotation wheel may be cleansed with compressed air or with hard-hitting appliances (only water with none chemical additives). Caution: Air- or water jet should impringe on rotation wheel square. Plate money handler Dry cleaning (every three months) . Remove four collateral review covers on casing. Insert improvement covers underneath device into collateral retailers. Blow through recess and outlet facet of warmth money handler from high to bottom with compressed gas. Remove dirt from improvement covers. Remove improvement covers underneath device. Install review cowl. Wet improvement, annually Use high appliances with flat nozzle (drawing 7). Remove the four collateral review covers on casing of warmth money handler. Insert improvement covers underneath the warmth money handler into collateral retailers, so the outflowing sloppy water gets into the retailers. Sloppy water flows out on drain on bottom of casing. Clean inlet- and outlet facet of warmth money handler with high appliance from high to bottom and reverse. Steam jet should be hold parallel to laminas of warmth money handler (drawing 8). Clean inlet- and outlet facet once more from the highest to rock bottom. Remove improvement covers below heat exchangers. Install review cowl. Let instrumentality run ten minutes to dry device. With intrinsical drop eliminator: Laminars square measure withdrawable and should be cleansed individually. Dirty and calcified drop eliminators can result in condensationpassing through. to wash and decalcify drop agent Rosenberg recommends ROGA-LIN from ROGA-Chemie in Aachen (Tel.: 0241/16 thirty four 85). Cleaning of sanitary units should be through with special care, as for instance the improvement of all metals of cooling and heating coils, drop eliminators, withdrawable frost protection frames, filters, etc. In case the area behind the device is inaccessible, it should be screwn off for cleaning. Rosenberg merchandise square measure subject to steady quality control and square measure in accordance with valid laws. In case you've got any queries with relevance our merchandise please contact either the creator of your air handling unit or one among our distributors. Rosenberg Ventilatoren GmbH Maybachstrasse 1 D-74653 Künzelsau-Gaisbach Tel.: 07940 / 142-0 Telefax: 07940 / 142-125 Mail: Info@Rosenberg-GmbH.com |