PROJECT IDENTIFICATION AND SIGNS FURNISH, INSTALL, AND MAINTAIN TEMPORARY ON-SITE INFORMATIONAL SIGNS

 

PROJECT IDENTIFICATION AND SIGNS FURNISH, INSTALL, AND MAINTAIN TEMPORARY ON-SITE INFORMATIONAL SIGNS QUALITY ASSURANCE SUBMITTAL SIGN MATERIALS EXECUTION RELATED REQUIREMENTS CONTRACTOR'S OFFICE

PROJECT IDENTIFICATION AND SIGNS FURNISH, INSTALL, AND MAINTAIN TEMPORARY ON-SITE INFORMATIONAL SIGNS QUALITY ASSURANCE SUBMITTAL SIGN MATERIALS EXECUTION RELATED REQUIREMENTS CONTRACTOR'S OFFICE
PROJECT IDENTIFICATION AND SIGNS FURNISH, INSTALL, AND MAINTAIN TEMPORARY ON-SITE INFORMATIONAL SIGNS QUALITY ASSURANCE SUBMITTAL SIGN MATERIALS EXECUTION RELATED REQUIREMENTS CONTRACTOR'S OFFICE

 PROJECT IDENTIFICATION AND SIGNS

 PART one - GENERAL

 1.1       REQUIREMENTS

   A.      Furnish, install, and maintain:

 1.         Project Identification Sign(s)

 2.         Temporary on-the-scene informational signs

   B.      Contractor shall place no totally {different|completely different} signs or advertisements on the premises except for warnings and different signs required by laws and ordinances.

 1.2       PROJECT IDENTIFICATION SIGN(S)

   A.      Contractor shall provide at each separate approved work web site a symbol indicating the presence of the individual Contractor. the location shall be lighted and of high public visibility, adjacent to the foremost entrance to web site, as approved by the Owner.

   B.      The sign(s) shall be a try of.8 m high x 3.0 m wide. vogue for these sign(s) shall be as shown on the project identification board commonplace drawing vary RC-GE-002. to boot among the Owner General commonplace and Technical pointers.

   C.      knowledge on the sign(s) shall be as shown on Project Identification Sign Board below commonplace drawing vary RC-GE-002.  The sign shall be in Arabic and English.

   D.      Graphic vogue, type of inscription, and color as elite by Owner.

 1.3       INFORMATIONAL SIGNS

   A.      provide signs at locations to clearly indicate the facilities and key components of the work.

   B.      Size of signs and inscription as applicable to usage.

   C.      Graphic designs, type of inscription and hues as hand-picked by the Owner General commonplace and Technical pointers.

 1.4       QUALITY ASSURANCE

             The painter shall have hot experience in type of work required.

 1.5       SUBMITTAL

            The Contractor shall submit the design and a locations of all signs to the Owner for approval before installation.

 PART a try of - merchandise

 2.1       SIGN MATERIALS

   A.      Structure and Framing: is additionally new or used, wood or metal, in structurally sound condition, and applicable for such finish.

   B.      Sign Surfaces:  Exterior softwood plywood with medium density overlay, commonplace large sizes to attenuate joints.  Thickness up to span framing members and to provide even swish surface whereas not waves or buckles.

   C.      Rough Hardware:  Galvanized.

   D.      Paint:  Exterior quality, up to resist weathering and attenuation throughout the contract quantity.

 PART 3 - EXECUTION

 3.1       SIGNS

   A.      Construct and install project identification signs in accordance with the approved vogue.

   B.      Install informational signs at a height for optimum visibility; on ground mounted poles or connected to temporary structural surfaces.

   C.      Paint exposed surfaces of supports, framing and surface material; one coat of primer and one coat of exterior paint.

   D.      Paint Exposed Surfaces:  One coat of primer and one coat of paint.

   E.       Paint graphics in styles, sizes, and hues elite.

 3.2       MAINTENANCE

   A.      Maintain signs and supports throughout a neat, clean condition; repair any damages to structure, framing or sign.

   B.      Relocate informational signs professional re nata by progress of the work.

 3.3       REMOVAL

   A.      subtract signs, framing, supports, and foundations at completion of the work.

 FIELD OFFICES AND SHEDS

 PART one – GENERAL

 1.1       REQUIREMENTS engulfed

   A.      Furnish, install and maintain temporary field offices throughout entire construction quantity.

   B.      Furnish, install and maintain storage sheds required for construction through Initial Acceptance.

 C.        Contractor must submit plans/lay-out for Field geographic point and Sheds for Owner approval.

 D.        Removal of field offices, storage sheds and their contents as directed by the Owner.

 E.         provide bilingual secretary to support project documentation activities

            at the Owner Construction geographic point

 1.2       RELATED wants

   A.      Section:  Contractor Use of Premises

   B.      Section:  Temporary Utilities and Facilities

 1.3       OTHER wants

   A.      before installation of offices and sheds, get the approval of the Owner in accordance with the operating papers wants engulfed in Section1017.

 1.4       CONSTRUCTION wants

   A.      General:

 1.         Facilities shall be structurally sound, weather tight, with floors raised on prime of grade.

 2.         Thermal Transmission Resistance:  Compatible with occupancy and storage wants.

 3.         At Contractor's chance, transferrable buildings or mobile homes, that area unit modified for geographic point or storage use, is additionally used.

 4.         Permanent facilities shall not be used for field offices or for storage.

 1.5       CONTRACTOR'S geographic point

  A.       Size: professional re nata for general use and to provide house for project conferences.

  B.       Furnishings in Meeting Area:

 1.         table and chairs for a minimum of eight persons

 2.         Racks and files for Project Record Documents in, or adjacent to, the meeting house

   C.      completely different Furnishings:  Contractor's chance

   D.      Lighting and Temperature Control:  Contractor's chance

   E.       Telephone:  One direct line instrument, minimum

   F.       One 10 in. (250 mm) outdoor-type measuring device

 1.6       CONTRACTORS STORAGE SHEDS

   A.      To wants of various trades

   B.      Dimensions:  Sized for storage and handling of merchandise.

   C.      Ventilation: go with such and code wants for merchandise keep.

   D.      Air Conditioning:  Provided to stay up temperatures per individual sections for the merchandise keep.

 PART a try of – merchandise

 2.1       MATERIALS, instrumentation AND FURNISHINGS

   A.      Materials, instrumentation and furnishing ought to be new and adequate for required purpose and will not violate applicable codes or laws.

 PART 3 – EXECUTION

 3.1       PREPARATION

   A.      Fill and grade sites for temporary structures to provide surface evacuation.

 3.2       INSTALLATION

   A.      Construct temporary field offices and storage sheds on correct foundations, provide connections for utility services.

 3.3       MAINTENANCE AND cleansing+ A.      The Contractor shall provide daily maintenance and cleansing for all temporary structures, furnishings and instrumentation, at the side of services.